Browse Through Our Past Electrical Projects

Browse Through Our Past Electrical Projects

Confidential Client

LOCATION

Chandler, AZ

CONSTRUCTION DURATION

2 months

 

PROJECT DESCRIPTION

4.5-megawatt build-out in a live data center environment. Installed 4000-amp generators, 2500-kVA transformers, docking stations, tap boxes, PDUs, RPPs, security systems, FA, controls, and BMS system. Full IST commissioning.

picture-1130_1

Confidential Client

cyrus_1

LOCATION

Chandler, AZ

 

CONSTRUCTION DURATION

12 months

 

PROJECT DESCRIPTION

300,000-sq.-ft. Greenfield project consisting of underground duct bank systems, medium-voltage, branch-circuits, lightning, controls, fire alarm, BMS system, and security. Installing all OFCI equipment, house generator, main distribution system, and transformers.

SRP Project

LOCATION

Chandler, AZ

 

CONSTRUCTION DURATION

4 weeks

 

PROJECT DESCRIPTION

Switch Electric teamed up with SRP on a live data center environment to demo and re-install 60,000 ft. of 1000 KCMIL, 15 kV medium-voltage cable.

img-1162_1_orig (1)

Confidential Client

picture1_1

LOCATION

Chandler, AZ

 

CONSTRUCTION DURATION

3 months

 

PROJECT DESCRIPTION

​4.5-megawatt project installed in a live data center. Project consisted of inventorying OFCI, installing 400 ft. of busway, and 20,000 ft. of 300 KCMIL MC cable. Commissioning and IR scanning.